UNDER THE GUIDANCE OF
V. MADDILETY RANGADU, M. TECH
PRESENTED BY
G. SRINIVASULU
14BC1A0124
1
 1. INTRODUCTION
 2. COMPONENT PARTS OF TURNOUTS
 3. OPERATION
 4. CLASSIFICATION OF TURNOUTS
 5. SAFETY
 6. CONCLUSION
 7. REFERENCES
2
 A railway switch or turnout is a mechanical installation enabling railway
trains to be guided from one track to another at a railway junction.
 It consists of the pair of linked tapered rails known as the ‘points’ lying
between the diverging outer rails, can be moved laterally in to one of two
positions to direct a train coming from the point blades towards the straight
path or the diverging path
 A train moving from the narrow ends towards the point blades is said to be
executing a facing point movement, and the train coming from either of the
converging direction passing through the narrow points is said to be tailing
point movement
 A turnout generally consists of a straight through track and a diverging track.
 Right hand turnout have a diverging track to the right of the track and the
left hand turnout have a diverging track to the left of the track
3
 POINTS
 STOCK RAILS
 FROG
 CLOSURE RAILS
 GUARD RAILS
 HEEL BLOCK
 SWITCH OPERATING DEVICE
4
 Switch rails or Point
blades are the movable
rails which guide the
wheels towards either the
straight or the diverging
track.
 They are tapered on most
switches, but on stub they
have square ends
5
 Stock rails are the running
rails immediately alongside
of the switch rails against
which the switch rails lay
when in the closed
position. The stock rails are
otherwise ordinary rails
that are machined, drilled,
and bent as required to
suit the design of the
turnout switch and the
individual switch point
rails
6
 The frog, also known as the common
crossing, is the crossing point of two
rails. This can be assembled out of
several appropriately cut and bent
pieces of rail or can be a
single casting of manganese steel. On
lines with heavy use the casting may
be treated with explosive shock
hardening to increase service life
7
 Closure rails are the
straight or curved rails that
are positioned in between
the heel of switch and the
toe of frog
8
 Guard rail (check rail) is a short piece of rail
placed alongside the main (stock) rail opposite the
frog. These exist to ensure that the wheels follow
the appropriate flangeway through the frog and
that the train does not derail
9
 Heel block assemblies are units placed at the heel
of the switch that provide a splice with the
contiguous closure rail and a location for the
switch point rail to pivot at a fixed spread distance
from the stock rail
10
 A switch operating device moves switch rails.
Switch rails can be thrown (moved) from
one orientation to another by either a hand-
operated (manual) switch stand or a mechanically
or electro-mechanically (power-operated) switch
machine. In both cases, the operating devices are
positioned at the beginning of the turnout opposite
the switch-connecting rods near the point of the
switch rails.
11
 When the wheels reach the switch, the wheels are guided along the route
determined by which of the two points is connected to the track facing the
switch.
 If the left point is connected, the left wheel will be guided along the rail of that
point, and the train will diverge to the right. If the right point is connected,
the right wheel's flange will be guided along the rail of that point, and the
train will continue along the straight track.
 A mechanism is provided to move the points from one position to the other
 some switches are still controlled by a human operator. However, most are
now operated by a remotely controlled electric motor
12
 Single Crossover:
A single crossover consists of two
turnouts positioned in two tracks
that allow the vehicle to go from one
track to another. The two tracks are
usually, but not always, parallel,
and the turnouts are usually
identical. A pair of single
crossovers—one right hand and one
left hand—that are arranged
sequentially along the tracks is
called a universal crossover.
13
 Double Crossover:
A double crossover sometimes called a scissors
crossover consists of two crossovers of opposite
hand orientation superimposed upon each other.
In addition to the four turnouts involved, a track
crossing diamond is needed between the two main
tracks. A double crossover is typically used only
when it is necessary to be able to switch from both
tracks to the other in either direction, but there is
insufficient space to install a universal crossover.
14
 Track Crossing:
Track crossings, as the name implies,
permit two tracks to cross each other.
Track crossings are often called either
crossing diamonds or simply diamonds,
due to their plan view shape
15
 SLIP SWITCH
A single slip switch works on
the same principle as a
double slip but provides for
only one switching
possibility. Trains
approaching on one of the
two crossing tracks can
either continue over the
crossing, or switch tracks to
the other line
16
 Lapped Turnouts:
Lapped turnouts can be used to achieve a
more compact track layout in constrained
locations. In a lapped turnout, as seen in
following picture, the switch rails for a
second turnout will be placed between the
switch and the frog of the initial turnout.
This introduces a third frog where a
closure rail of the first turnout crosses a
closure rail of the second turnout
17
 Reversing the points under a moving train will almost always derail the train
 Points might move due to the extreme forces exerted by a passing train
 Interlockings that allow signals only to be cleared when switches are set
correctly
 Track circuits to prevent reversing when a passing train is detected
 Electrical devices should be checked frequently
18
 On a lightly-trafficked line, with careful maintenance it can last for 25 years,
but at a busy junction on a main line it may have to be replaced every 12
months. The work is usually carried out at night to avoid disrupting the
timetable
 . When travelling through a turnout at speed, the safety of a train depends on
accurate alignment of the switch-blades and associated gear. A rigorous
maintenance regime is essential, and it doesn’t necessarily involve high
technology
 . A set of turnouts may be trial assembled beforehand off site, to check that
everything fits
19
 Physicist Richard Feynman explains how a train stays on the tracks. BBC TV
'Fun to Imagine' (1983)
 Rules 8.9, 8.15, and 8.18, General Code of Operating Rules, Fifth Edition. (c)
2005 General Code of Operating Rules Committee
 Points and Crossings from Vossloh Cogifer
 "63 FR 39343 – Automatic Train Control and Advanced Civil Speed
Enforcement System; Northeast Corridor Railroads". Federal Railroad
Administration. Retrieved 21 October 2012
 Information on winter operation by dutch infrastructure manager Prorail (in
dutch)
 Meyers, Marc A. (1994). Dynamic behavior of materials. New York: John
Wiley. pp. 5; 570. ISBN 978-0-471-58262-5
 "Scene of the Accident". The Argus. Melbourne: National Library of Australia.
29 January 1906. p. 7. Retrieved 20 July 2011 20
21

More Related Content

What's hot

Points and crossing
Points and crossingPoints and crossing
Points and crossingAkash Patel
 
Construction of a New Railway Track
Construction of a New  Railway TrackConstruction of a New  Railway Track
Construction of a New Railway TrackArbaz Kazi
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossingssrinivas2036
 
Station and Yards in Indian Railway
Station and Yards in Indian RailwayStation and Yards in Indian Railway
Station and Yards in Indian RailwayArbaz Kazi
 
11.track junctions and layouts
11.track junctions and layouts11.track junctions and layouts
11.track junctions and layoutsMani Vel
 
Railway Engineering-Curves and superelevation
Railway Engineering-Curves and superelevationRailway Engineering-Curves and superelevation
Railway Engineering-Curves and superelevationMani Vel
 
Coning of Wheels in Railways & Rail Creep
Coning of Wheels in Railways & Rail CreepConing of Wheels in Railways & Rail Creep
Coning of Wheels in Railways & Rail CreepRAMPRASAD KUMAWAT
 
3.alignment of railway lines
3.alignment of railway lines3.alignment of railway lines
3.alignment of railway linesMani Vel
 
Points and crossings ( special assigments )
Points and crossings ( special assigments )Points and crossings ( special assigments )
Points and crossings ( special assigments )hiranrathva
 
Geometric design of the track
Geometric design of the trackGeometric design of the track
Geometric design of the trackT.Naga Anusha
 
Fittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdfFittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdfTVijayaGowri
 
Chapter 1 introductution to railway and permanent way
Chapter 1 introductution to railway and permanent wayChapter 1 introductution to railway and permanent way
Chapter 1 introductution to railway and permanent waydhara dattani
 
5.track or permanent way and track stresses
5.track or permanent way and track stresses5.track or permanent way and track stresses
5.track or permanent way and track stressesMani Vel
 
Defects in rails. Railway Engineering
Defects in rails. Railway EngineeringDefects in rails. Railway Engineering
Defects in rails. Railway EngineeringIrfan Nasir
 
Railway track construction, drainage & maintenence
Railway track  construction, drainage & maintenenceRailway track  construction, drainage & maintenence
Railway track construction, drainage & maintenenceGhanashyam Prajapati
 
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of RailsRails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of Railssrinivas2036
 
Railway Engineering - Geometric design of track
Railway Engineering - Geometric design of trackRailway Engineering - Geometric design of track
Railway Engineering - Geometric design of trackMani Vel
 

What's hot (20)

Points and crossing
Points and crossingPoints and crossing
Points and crossing
 
Construction of a New Railway Track
Construction of a New  Railway TrackConstruction of a New  Railway Track
Construction of a New Railway Track
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
Station and Yards in Indian Railway
Station and Yards in Indian RailwayStation and Yards in Indian Railway
Station and Yards in Indian Railway
 
11.track junctions and layouts
11.track junctions and layouts11.track junctions and layouts
11.track junctions and layouts
 
Railway Engineering-Curves and superelevation
Railway Engineering-Curves and superelevationRailway Engineering-Curves and superelevation
Railway Engineering-Curves and superelevation
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Coning of Wheels in Railways & Rail Creep
Coning of Wheels in Railways & Rail CreepConing of Wheels in Railways & Rail Creep
Coning of Wheels in Railways & Rail Creep
 
Left hand turnout
Left hand turnoutLeft hand turnout
Left hand turnout
 
Signals on Railway
Signals on RailwaySignals on Railway
Signals on Railway
 
3.alignment of railway lines
3.alignment of railway lines3.alignment of railway lines
3.alignment of railway lines
 
Points and crossings ( special assigments )
Points and crossings ( special assigments )Points and crossings ( special assigments )
Points and crossings ( special assigments )
 
Geometric design of the track
Geometric design of the trackGeometric design of the track
Geometric design of the track
 
Fittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdfFittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdf
 
Chapter 1 introductution to railway and permanent way
Chapter 1 introductution to railway and permanent wayChapter 1 introductution to railway and permanent way
Chapter 1 introductution to railway and permanent way
 
5.track or permanent way and track stresses
5.track or permanent way and track stresses5.track or permanent way and track stresses
5.track or permanent way and track stresses
 
Defects in rails. Railway Engineering
Defects in rails. Railway EngineeringDefects in rails. Railway Engineering
Defects in rails. Railway Engineering
 
Railway track construction, drainage & maintenence
Railway track  construction, drainage & maintenenceRailway track  construction, drainage & maintenence
Railway track construction, drainage & maintenence
 
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of RailsRails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
 
Railway Engineering - Geometric design of track
Railway Engineering - Geometric design of trackRailway Engineering - Geometric design of track
Railway Engineering - Geometric design of track
 

Similar to turnouts in railways

Track junction and simple track layouts
Track junction and simple track layoutsTrack junction and simple track layouts
Track junction and simple track layoutsMaulik Vithalapara
 
Railway points, crossings and components
Railway points, crossings and componentsRailway points, crossings and components
Railway points, crossings and componentsSunil Kumar Meena
 
Chapter 6 Points,crossings and yards
Chapter 6 Points,crossings and yardsChapter 6 Points,crossings and yards
Chapter 6 Points,crossings and yardsKHUSHBU SHAH
 
report on the West central railway
report on the West central railwayreport on the West central railway
report on the West central railwayYuvraj Singh
 
TRAIN TRACK JUNCTION
TRAIN TRACK JUNCTIONTRAIN TRACK JUNCTION
TRAIN TRACK JUNCTIONKarthikSai86
 
ahmed abd elmomen khalil_Week 13 Turnouts and crossings (4).pdf
ahmed abd elmomen khalil_Week 13 Turnouts and crossings (4).pdfahmed abd elmomen khalil_Week 13 Turnouts and crossings (4).pdf
ahmed abd elmomen khalil_Week 13 Turnouts and crossings (4).pdfNeerockKhatri
 
139091630-Points-Crossings-and-Station-Platforms-Yards.pdf
139091630-Points-Crossings-and-Station-Platforms-Yards.pdf139091630-Points-Crossings-and-Station-Platforms-Yards.pdf
139091630-Points-Crossings-and-Station-Platforms-Yards.pdfRaj Bakhtani
 
Current collction system.pptx
Current collction system.pptxCurrent collction system.pptx
Current collction system.pptxssuserca5764
 
Presentation Maglev
Presentation Maglev Presentation Maglev
Presentation Maglev Navin Kumar
 
Railway engineering
Railway engineeringRailway engineering
Railway engineeringhiranrathva
 
Creep of Rails.pdf
Creep of Rails.pdfCreep of Rails.pdf
Creep of Rails.pdfTVijayaGowri
 
Maglev
MaglevMaglev
Maglevmokhim
 
1Point & crossing.pdf
1Point & crossing.pdf1Point & crossing.pdf
1Point & crossing.pdfS2Motivation1
 
Transportation in underground mines
Transportation  in underground mines Transportation  in underground mines
Transportation in underground mines vanam mareswara rao
 
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702Dr. BASWESHWAR JIRWANKAR
 

Similar to turnouts in railways (20)

Track junction and simple track layouts
Track junction and simple track layoutsTrack junction and simple track layouts
Track junction and simple track layouts
 
Railway points, crossings and components
Railway points, crossings and componentsRailway points, crossings and components
Railway points, crossings and components
 
Chapter 6 Points,crossings and yards
Chapter 6 Points,crossings and yardsChapter 6 Points,crossings and yards
Chapter 6 Points,crossings and yards
 
report on the West central railway
report on the West central railwayreport on the West central railway
report on the West central railway
 
TRAIN TRACK JUNCTION
TRAIN TRACK JUNCTIONTRAIN TRACK JUNCTION
TRAIN TRACK JUNCTION
 
Points and Crossings
Points and Crossings Points and Crossings
Points and Crossings
 
ahmed abd elmomen khalil_Week 13 Turnouts and crossings (4).pdf
ahmed abd elmomen khalil_Week 13 Turnouts and crossings (4).pdfahmed abd elmomen khalil_Week 13 Turnouts and crossings (4).pdf
ahmed abd elmomen khalil_Week 13 Turnouts and crossings (4).pdf
 
139091630-Points-Crossings-and-Station-Platforms-Yards.pdf
139091630-Points-Crossings-and-Station-Platforms-Yards.pdf139091630-Points-Crossings-and-Station-Platforms-Yards.pdf
139091630-Points-Crossings-and-Station-Platforms-Yards.pdf
 
Ppt mine machinery
Ppt mine machineryPpt mine machinery
Ppt mine machinery
 
Rail Joints.pdf
Rail Joints.pdfRail Joints.pdf
Rail Joints.pdf
 
Current collction system.pptx
Current collction system.pptxCurrent collction system.pptx
Current collction system.pptx
 
Presentation Maglev
Presentation Maglev Presentation Maglev
Presentation Maglev
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Creep of Rails.pdf
Creep of Rails.pdfCreep of Rails.pdf
Creep of Rails.pdf
 
Maglev
MaglevMaglev
Maglev
 
Basics of maglev
Basics of maglevBasics of maglev
Basics of maglev
 
1Point & crossing.pdf
1Point & crossing.pdf1Point & crossing.pdf
1Point & crossing.pdf
 
Transportation in underground mines
Transportation  in underground mines Transportation  in underground mines
Transportation in underground mines
 
Maglev train
Maglev trainMaglev train
Maglev train
 
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
 

Recently uploaded

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 

Recently uploaded (20)

Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 

turnouts in railways

  • 1. UNDER THE GUIDANCE OF V. MADDILETY RANGADU, M. TECH PRESENTED BY G. SRINIVASULU 14BC1A0124 1
  • 2.  1. INTRODUCTION  2. COMPONENT PARTS OF TURNOUTS  3. OPERATION  4. CLASSIFICATION OF TURNOUTS  5. SAFETY  6. CONCLUSION  7. REFERENCES 2
  • 3.  A railway switch or turnout is a mechanical installation enabling railway trains to be guided from one track to another at a railway junction.  It consists of the pair of linked tapered rails known as the ‘points’ lying between the diverging outer rails, can be moved laterally in to one of two positions to direct a train coming from the point blades towards the straight path or the diverging path  A train moving from the narrow ends towards the point blades is said to be executing a facing point movement, and the train coming from either of the converging direction passing through the narrow points is said to be tailing point movement  A turnout generally consists of a straight through track and a diverging track.  Right hand turnout have a diverging track to the right of the track and the left hand turnout have a diverging track to the left of the track 3
  • 4.  POINTS  STOCK RAILS  FROG  CLOSURE RAILS  GUARD RAILS  HEEL BLOCK  SWITCH OPERATING DEVICE 4
  • 5.  Switch rails or Point blades are the movable rails which guide the wheels towards either the straight or the diverging track.  They are tapered on most switches, but on stub they have square ends 5
  • 6.  Stock rails are the running rails immediately alongside of the switch rails against which the switch rails lay when in the closed position. The stock rails are otherwise ordinary rails that are machined, drilled, and bent as required to suit the design of the turnout switch and the individual switch point rails 6
  • 7.  The frog, also known as the common crossing, is the crossing point of two rails. This can be assembled out of several appropriately cut and bent pieces of rail or can be a single casting of manganese steel. On lines with heavy use the casting may be treated with explosive shock hardening to increase service life 7
  • 8.  Closure rails are the straight or curved rails that are positioned in between the heel of switch and the toe of frog 8
  • 9.  Guard rail (check rail) is a short piece of rail placed alongside the main (stock) rail opposite the frog. These exist to ensure that the wheels follow the appropriate flangeway through the frog and that the train does not derail 9
  • 10.  Heel block assemblies are units placed at the heel of the switch that provide a splice with the contiguous closure rail and a location for the switch point rail to pivot at a fixed spread distance from the stock rail 10
  • 11.  A switch operating device moves switch rails. Switch rails can be thrown (moved) from one orientation to another by either a hand- operated (manual) switch stand or a mechanically or electro-mechanically (power-operated) switch machine. In both cases, the operating devices are positioned at the beginning of the turnout opposite the switch-connecting rods near the point of the switch rails. 11
  • 12.  When the wheels reach the switch, the wheels are guided along the route determined by which of the two points is connected to the track facing the switch.  If the left point is connected, the left wheel will be guided along the rail of that point, and the train will diverge to the right. If the right point is connected, the right wheel's flange will be guided along the rail of that point, and the train will continue along the straight track.  A mechanism is provided to move the points from one position to the other  some switches are still controlled by a human operator. However, most are now operated by a remotely controlled electric motor 12
  • 13.  Single Crossover: A single crossover consists of two turnouts positioned in two tracks that allow the vehicle to go from one track to another. The two tracks are usually, but not always, parallel, and the turnouts are usually identical. A pair of single crossovers—one right hand and one left hand—that are arranged sequentially along the tracks is called a universal crossover. 13
  • 14.  Double Crossover: A double crossover sometimes called a scissors crossover consists of two crossovers of opposite hand orientation superimposed upon each other. In addition to the four turnouts involved, a track crossing diamond is needed between the two main tracks. A double crossover is typically used only when it is necessary to be able to switch from both tracks to the other in either direction, but there is insufficient space to install a universal crossover. 14
  • 15.  Track Crossing: Track crossings, as the name implies, permit two tracks to cross each other. Track crossings are often called either crossing diamonds or simply diamonds, due to their plan view shape 15
  • 16.  SLIP SWITCH A single slip switch works on the same principle as a double slip but provides for only one switching possibility. Trains approaching on one of the two crossing tracks can either continue over the crossing, or switch tracks to the other line 16
  • 17.  Lapped Turnouts: Lapped turnouts can be used to achieve a more compact track layout in constrained locations. In a lapped turnout, as seen in following picture, the switch rails for a second turnout will be placed between the switch and the frog of the initial turnout. This introduces a third frog where a closure rail of the first turnout crosses a closure rail of the second turnout 17
  • 18.  Reversing the points under a moving train will almost always derail the train  Points might move due to the extreme forces exerted by a passing train  Interlockings that allow signals only to be cleared when switches are set correctly  Track circuits to prevent reversing when a passing train is detected  Electrical devices should be checked frequently 18
  • 19.  On a lightly-trafficked line, with careful maintenance it can last for 25 years, but at a busy junction on a main line it may have to be replaced every 12 months. The work is usually carried out at night to avoid disrupting the timetable  . When travelling through a turnout at speed, the safety of a train depends on accurate alignment of the switch-blades and associated gear. A rigorous maintenance regime is essential, and it doesn’t necessarily involve high technology  . A set of turnouts may be trial assembled beforehand off site, to check that everything fits 19
  • 20.  Physicist Richard Feynman explains how a train stays on the tracks. BBC TV 'Fun to Imagine' (1983)  Rules 8.9, 8.15, and 8.18, General Code of Operating Rules, Fifth Edition. (c) 2005 General Code of Operating Rules Committee  Points and Crossings from Vossloh Cogifer  "63 FR 39343 – Automatic Train Control and Advanced Civil Speed Enforcement System; Northeast Corridor Railroads". Federal Railroad Administration. Retrieved 21 October 2012  Information on winter operation by dutch infrastructure manager Prorail (in dutch)  Meyers, Marc A. (1994). Dynamic behavior of materials. New York: John Wiley. pp. 5; 570. ISBN 978-0-471-58262-5  "Scene of the Accident". The Argus. Melbourne: National Library of Australia. 29 January 1906. p. 7. Retrieved 20 July 2011 20
  • 21. 21